Hoist manufacturers to tell you about the installation and maintenance of the hoist

Author: admin Release time: 17:07, March 26, 2018 Number of visits:

The maintenance of the machine is a very important and regular work. It should be closely coordinated with the operation and maintenance, and full-time personnel should be on duty for inspection
The bearing of the bearing crusher bears all the load of the machine, so good lubrication has a great relationship with the bearing life, which directly affects the service life and operation rate of the machine. Therefore, the lubricating oil injected must be clean and the sealing must be good, Hoist (1) rotating bearing (2) roller bearing (3) all gears (4) movable bearing and sliding plane.
The newly installed tyre is easy to loosen and must be checked frequently.
Pay attention to whether all parts of the machine work normally.
Pay attention to check the wear degree of the easily worn parts and replace the worn parts at any time.
Dust and other things should be removed from the underframe plane of the movable device, so as to prevent the movable bearing from moving on the underframe when the machine encounters materials that can not be broken, thus causing serious accidents.
If the bearing oil temperature rises, stop the machine immediately and check the cause.
If there is impact sound when the rotating gear is running, stop the machine immediately for inspection.
Installation and commissioning
The equipment shall be installed on a horizontal concrete foundation and fixed with anchor bolts.
When installing, pay attention to the verticality between the main body and the horizontal.
After installation, check whether the bolts at all parts are loose and whether the main engine compartment door is tight. If so, please tighten them.
The power line and control switch are configured according to the power of the equipment.
After the inspection, the no-load test run is carried out, and the production can be carried out if the test run is normal.